Skip to content
CnergyPro
CnergyPro

Structured cabling, supply, power and IT for data center builds.

Aerial view of a large modern building with rooftop cooling plant beside a road

CnergyPro Infrastructure

Structured cabling, supply, power and IT for data center builds.

Hands dressing bundled blue network cables into rack-mounted patch panels

Structured cabling

Division 27 scope, installed, tested and labeled.

Equipment and material supply

Staged and delivered in the order the schedule needs.

General contracting

Prime contracts for technology-led builds and fit-outs.

Power and energy infrastructure

The equipment between the utility and the rack.

Information technology

The network and systems, configured and brought into service.

One team, from bid to turnover.

What we deliver

Our approach

One team that owns its scope, from the drawings to the test results.

  1. Read the specification

    We work from the drawings and specifications, and name scope gaps and long-lead items at bid, not after award.

  2. Price the whole scope

    One price for the whole scope, with exclusions and assumptions listed, not buried.

  3. Work to your program

    Work follows the general contractor's schedule, safety plan and quality program, with daily reports.

  4. Close out clean

    Every link tested, every cable labeled, and records the operator can run the building from.

Data centers and AI infrastructure

The buildout is a power problem and a connectivity problem. We work on both ends of it.

AI campuses are being built faster than the supply chain and the trades can comfortably serve. The scopes that slip are the ones with long lead times and dense, repetitive installation: power equipment that has to be on site on time, fiber, and the thousands of terminations in the white space. We supply the first and install the rest.

  1. Site and shell

    Pathways and conduit coordination, temporary site network, entrance facility and meet-me room rough-in.

  2. Power

    Supply of backup and distribution equipment to specification; monitoring and controls cabling for the power train.

  3. White space

    Racks, containment, overhead tray, fiber trunks and copper to every cabinet, tested and labeled.

  4. Commissioning

    Link certification, network equipment staging, as-builts and a turnover package the operator can run from.

Facility typesHyperscale and colocation · Enterprise and edge · Modular and prefabricated · Network and equipment rooms

Data hall with a raised floor, equipment cabinets and overhead cable tray carrying blue cabling

Schools and hospitals

The same Division 27 scope, for classrooms and patient floors.

A school or a hospital asks different things of the cabling than a data hall does: coverage in every room, more telecom rooms, and pathways shared with every other trade. The scope is still Division 27, and we deliver it the same way, as a trade partner to the general contractor: installed to the drawings, every link tested, every cable labeled.

  1. Backbone and telecom rooms

    Fiber and copper backbone between buildings and floors, with MDF and IDF rooms built out, grounded and bonded.

  2. Horizontal cabling

    Copper to every classroom, office, nurse station and patient room outlet, terminated, tested and labeled.

  3. Wireless and device drops

    Cabling for wireless access points, displays, phones and the networked devices the specification calls for.

  4. Turnover

    Test results, as-builts and labeling records handed to the facilities and IT teams who will run the building.

Building typesK-12 schools · College and university buildings · Hospitals · Clinics and medical office buildings

Our scope here is structured cabling. Fire alarm, security and nurse call systems are outside it and stay with their own contractors.

Cabling scope

How we deliver

General contractors need trade partners who read the specification, price the whole scope, show up to the schedule and close out cleanly. We self-perform structured cabling, supply the equipment and materials around it, and deploy the network and systems that run on it. Where the technology is the project, we take the prime contract.

Site engineer in a hard hat checking a tablet on an industrial site

Preconstruction

Drawings and specifications reviewed, scope gaps and long-lead items named, and a price and schedule you can hold us to.

Send a bid package
Worker on a powered pallet truck pulling roll cages down an aisle between tall warehouse racking full of stock

Procure

Submittals approved, materials ordered against the schedule, staged and kitted before they reach the dock.

Supply scope
Workers tying a reinforcing-steel column on a concrete slab, seen from above

Install

Work follows the general contractor's schedule, safety plan and quality program, with daily reports.

Cabling scope
Fiber and copper patch cords connected to the ports of a network switch

Test and turn over

Every link tested, every cable labeled, and a turnover package the operator can use on day one.

All scopes of work

Every turnover includes

Records the operator can run the building from.

  • Test results for every copper and fiber link
  • As-built drawings and rack elevations
  • Labeling schedule matched to the installed plant
  • Serial and asset records for supplied equipment
  • Manufacturer warranty documentation
  • Operation and maintenance information
  • Closeout documents in the general contractor's format

The same firm fixes the process the building runs on.

Once a room is in service, the work that depends on it still has to move: requests, approvals, asset records, the systems that should exchange data and do not. That is the larger part of what CnergyPro does.

What CnergyPro does